Task 4: QA/QC Prototyping
(Cremaldi, Reidy, Booke, student)
We have initiated studies on the design, fabrication and use of QA/QC equipment to be used by vendors and collaborating groups to check out the crystal assemblies. Much of the equipment needed in FY95 will come from Task 1.